Research Candidates – Approval Step 3
Show candidates related to:
 
Candidates that have advanced to Step 4 are outlined in blue.
Research Candidate Statement
1 of 6
Funding: $500,000
Funding Source: Full NCHRP
Timeframe: 12-18 months
Objectives

The objective of this research is to:
1. Evaluate current federal pavement condition measures (Ride Quality, Rutting, Faulting, and Cracking), performance thresholds, and overall performance measure with respect to:
a. Consistency – across various pavement types, network designations, and lane configurations
b. Usefulness – in network-level pavement condition summary and asset management decision-making, prioritization, and forecasts; and
c. Alignment – with state established pavement condition metrics

2. Provide recommendations to improve existing measures and/or identify metrics that better reflect pavement failure mechanisms and enhance decision-making taking into account not
only the assessment of current and future condition but also their implications in economic analyses of long-term maintenance and rehabilitation. Evaluate pavement leading indicators as an alternative to the current version of the PM2.

3. Identify and address in detail specific challenges for each condition measure (Ride Quality, Rutting, Faulting, and Cracking) for consistency, including thresholds. For example, determine if wheel path cracking considerations could be revised to provide more consistent results across pavement types (e.g. composite, concrete) and pavement widths (e.g. <12 ft.) 4. Evaluate structural capacity indicators for potential consideration as a Federal measure.

Champions
Cristina Torres-Machi | University of Colorado Boulder | E-mail
Juan Diego Porras-Alvarado | WSP | E-mail
Louis Feagans | Indiana DOT | E-mail
Laura Heckel | Illinois DOT | E-mail
Anne-Marie McDonnell | Connecticut DOT | E-mail

Research Candidate Statement
2 of 6
Funding: $350,000
Funding Source: Full NCHRP
Timeframe: 18 months
Objectives

Develop guidance on an asset management corridor planning process to prioritize and schedule project delivery for cost effectiveness while also considering mobility/accessibility issues, drainage, and more.

Champions
No items found

Research Candidate Statement
2 of 6
Funding: $250,000
Funding Source: Full NCHRP
Timeframe: 18 months
Objectives

Develop a framework and guidance for calculating and communicating the overall benefit of improved asset management approaches to transportation agencies, transportation system users, and society of improved asset management approaches. The framework should address monetized benefits, as well as issues such as equity, sustainability, and resilience. Illustrate use of the framework and examples through a set of pilot studies of U.S. agencies.

Champions
Karuna Pujara | Maryland SHA | E-mail
William Johnson | Colorado DOT | E-mail

Research Candidate Statement
4 of 6
Funding: $400,000
Funding Source: Full NCHRP
Timeframe: 12 months
Objectives

The outcome from this effort will benefit quality assurance (QA) methods for data collection and inspection efforts, quantify the variability and sensitivity in target setting for DOTs, and help budget planning for asset inconsistencies.

Champions
Charlie Pilson | Kercher | E-mail
Dave Schrank | Texas A&M | E-mail
Mike Johnson | Caltrans | E-mail
Matt Haubrich | Iowa DOT | E-mail
Aimee Flannery | AEM | E-mail

Research Candidate Statement
5 of 6
Funding: $450,000
Funding Source: Full NCHRP
Timeframe: 12-18 months
Objectives

The objectives of this research are to:
• Generate risk identification techniques to determine high risk threats at project and network levels,
• Develop quantitative, repeatable approaches for assessing likelihood and consequences for these threats,
• Develop visual, interactive characterization methods (e.g., dashboards) to reflect an agency’s level of risk and the effectiveness of proposed mitigation actions,
• Allow risk and resilience to be on par with traditional performance measures.

High risk threats to be studied include, but are not limited to, extreme events (e.g., earthquakes, fires, hurricanes, avalanches, tornadoes), asset failure (structural and operational), financial, strategic, political, environmental (e.g., sea level rise, flooding), technological, and social justice risks.

The final deliverables could include guidebook with a spreadsheet or a framework for assessing high risk threats and incorporating the results into TAM efforts. The guidebook should feature a comprehensive review of existing literature and current practice. It should present a standard definition of resilience as well as step-by-step instructions to develop models, methods, and metrics for estimating resilience of highway systems to high risk threats. Pilot studies should be conducted with select agencies to test the guidance and calculation procedures.

Champions
No items found

Research Candidate Statement
6 of 6
Funding: $300,000
Funding Source: Full NCHRP
Timeframe: 18-24 months
Objectives

Develop communication tools and methodologies for engaging stakeholders in TAM program activities such as strategies development, performance management implementation, and budget development.

Champions
Aisha Anders | WSP | E-mail
Karen Miller | Missouri DOT | E-mail
Trisha Stefanski | Minnesota DOT | E-mail

Research Projects

Programmed

Programmed Project
Funding: $500,000
Funding Source: Full NCHRP
Start date: January 2021
End date: February 2022
Objectives

The objectives of this research are to develop guidance promoting the use of performance-based management strategies in maintenance and to present the resulting information in a format that is easily accessible to the maintenance community.


Programmed Project
Funding: $450,000
Funding Source: Full NCHRP
Start date: February 2021
End date: November 2020
Objectives

With the original project being completed in early 2020, the project panel has focused on both implementation of TAM Guide III and determining additional needs to make the TAM Guide III better based on the original literature research and review. An extensive literature search was conducted as a part of the original NCHRP project phase one work and the results generally incorporated and addressed in the new TAM Guide III; however, because of funding limitations, not all of the desired changes, updates, and enhancements could be addressed. Based on those limitations, the objective of this research is to provide further enhancements and content to the TAM Guide III.


Programmed Project
Funding: $500,000
Funding Source: Full NCHRP
Start date: February 2021
End date: January 2023
Objectives

Based on these changing conditions, the objective of this research is to investigate the needs and benefits from incorporating TSMO assets in TAMPs. The study will develop a guide for state DOTs to facilitate the inclusion of TSMO in TAMP without disrupting the established and on-going planning process.


Programmed Project
Funding: $400,000
Funding Source: Full NCHRP
Start date: April 2021
Objectives

The objective of this research is to develop a “playbook” with standards, specifications, and process flows to help airport operators with the accurate and timely delivery of new and replacement asset information/meta data to key airport stakeholders responsible for tracking and maintaining airport assets.


Programmed Project
Funding: $400,000
Funding Source: Full NCHRP
Start date: August 2021
End date: February 2023
Objectives

The objective of this research is to develop a “playbook” with standards, specifications, and process flows to help airport operators with the accurate and timely delivery of new and replacement asset information/meta data to key airport stakeholders responsible for tracking and maintaining airport assets.


Programmed Project
Funding: $450,000
Funding Source: Full NCHRP
Start date: April 2022
End date: January 2024
Objectives

With the original project being completed in early 2020, the project panel has focused on both implementation of TAM Guide III and determining additional needs to make the TAM Guide III better based on the original literature research and review. An extensive literature search was conducted as a part of the original NCHRP project phase one work and the results generally incorporated and addressed in the new TAM Guide III; however, because of funding limitations, not all of the desired changes, updates, and enhancements could be addressed. Based on those limitations, the objective of this research is to provide further enhancements and content to the TAM Guide III.


Programmed Project
Funding: $500,000
Funding Source: Full NCHRP
Start date: June 2022
End date: June 2024
Objectives

Based on these changing conditions, the objective of this research is to investigate the needs and benefits from incorporating TSMO assets in TAMPs. The study will develop a guide for state DOTs to facilitate the inclusion of TSMO in TAMP without disrupting the established and on-going planning process.


Programmed Project
Funding: $500,000
Funding Source: Full NCHRP
Start date: July 2022
End date: July 2024
Objectives

The objectives of this research are to develop guidance promoting the use of performance-based management strategies in maintenance and to present the resulting information in a format that is easily accessible to the maintenance community.



Active

Active Project
Funding: $300,000
Funding Source: Full NCHRP
Start date: June 2019
End date: December 2020
Objectives

The objectives of this research are to (1) estimate the current and future effect of dynamic CAV technologies on roadway and TSMO asset maintenance programs; (2) develop guidance on existing and proposed measureable standards associated with roadway and TSMO asset maintenance for preventive, reactive, and emerging maintenance needs; and (3) identify the associated resource and workforce development needs.


Active Project
Funding: $45,000
Funding Source: Full NCHRP
Start date: September 2019
End date: December 2020
Objectives

The objective of this synthesis is to document DOT collaboration with MPOs relative to target setting, investment decisions, and performance monitoring of pavement and bridge assets for performance-based planning and programming. The synthesis will focus on DOT practices to initiate and facilitate collaboration with MPOs.


Active Project
Funding: $45,000
Funding Source: Full NCHRP
Start date: September 2019
End date: December 2020
Objectives

The objective of this synthesis is to document DOT collaboration with MPOs relative to target setting, investment decisions, and performance monitoring of pavement and bridge assets for performance-based planning and programming. The synthesis will focus on DOT practices to initiate and facilitate collaboration with MPOs.


Active Project
Funding: $666,617
Funding Source: Full NCHRP
Start date: June 2018
End date: January 2021
Objectives

The objective of this research is to provide transportation agencies with practical guidance, recommendations, and successful implementation practices for

1. Integrating performance, risk, and asset management at transportation agencies;

2. Identifying, evaluating, and selecting appropriate management frameworks; and

3. Recruiting, training, and retaining human capital to support asset management and related functions.


Active Project
Funding: $400,000
Funding Source: Full NCHRP
Start date: August 2018
End date: January 2021
Objectives

The objective of this research is to develop a guidebook presenting principles, organizational strategies, governance mechanisms, and practical examples for improving management of the processes for collecting data, developing useful information, and providing that information for decision making about management of the transportation system assets. The guidebook should assist practitioners addressing at least the following topics:

• Conducting agency self-assessments of information management practices (for example, a maturity model and leading-practices descriptions), using existing tools and techniques to the extent these are available;
• Exploring transferrable data and information management practices from a variety of sources—DOTs and others not necessarily restricted to domestic transportation agencies—that have demonstrated effective asset management;
• Considering how to incorporate evolving technologies and state-of-the-art management practices, for example by providing agencies with management scenarios and exemplary data models;
• Establishing organizational structure, personnel capabilities requirements, outsourcing policies and practices, and governance policies and procedures to support effective provision of asset management information;
• Assessing options for staff development, outsourcing, and other strategies for ensuring the agency has appropriate capability and capacity for asset information management; and
• Developing a management roadmap for implementing unified, enterprise-wide governance of asset data and information, from initial project development through transportation asset and performance management.


Active Project
Funding: $400,000
Funding Source: Full NCHRP
Start date: August 2018
End date: January 2021
Objectives

The objective of this research is to develop a guidebook presenting principles, organizational strategies, governance mechanisms, and practical examples for improving management of the processes for collecting data, developing useful information, and providing that information for decision making about management of the transportation system assets. The guidebook should assist practitioners addressing at least the following topics:

• Conducting agency self-assessments of information management practices (for example, a maturity model and leading-practices descriptions), using existing tools and techniques to the extent these are available;
• Exploring transferrable data and information management practices from a variety of sources—DOTs and others not necessarily restricted to domestic transportation agencies—that have demonstrated effective asset management;
• Considering how to incorporate evolving technologies and state-of-the-art management practices, for example by providing agencies with management scenarios and exemplary data models;
• Establishing organizational structure, personnel capabilities requirements, outsourcing policies and practices, and governance policies and procedures to support effective provision of asset management information;
• Assessing options for staff development, outsourcing, and other strategies for ensuring the agency has appropriate capability and capacity for asset information management; and
• Developing a management roadmap for implementing unified, enterprise-wide governance of asset data and information, from initial project development through transportation asset and performance management.


Active Project
Funding: $500,000
Funding Source: Full NCHRP
Start date: April 2019
End date: April 2021
Objectives

The objective of this research is to develop guidance coupled with one or more prototypical, analytical model(s) to support life-cycle planning and decision-making that applies life-cycle cost analysis as a component of a system-wide transportation asset management program. This guidance and associated analytical model(s) will apply quantitative asset-level, project-level, and network-level inputs to demonstrate methods for calculating life-cycle costs associated with alternative scenarios while taking into account preservation, rehabilitation, replacement, maintenance, and potential risk mitigation actions on a range of highway assets. To the degree possible, costs should reflect condition, risk and uncertainty, mobility, safety, and any other quantifiable aspect of transportation system performance. Although this research is targeted to state DOT highway assets within the overall transportation network, the research should also identify additional research necessary to expand the process to include other modes.


Active Project
Funding: $530,000
Funding Source: Full NCHRP
Start date: February 2019
End date: April 2021
Objectives

The objectives of this research are to (1) assess the state of transportation agency practices regarding use of targets in their transportation performance management (TPM) decision making, monitoring performance results, and as necessary adjusting management strategies and desired target levels; and (2) develop resources that agency practitioners can use to implement and maintain a process of monitoring performance and making management decisions based on comparisons of targets and observed system performance. Such resources could include, for example, guidebooks, web-based publications, prototypical planning scenarios, interactive computational tools, and visualization tools.


Active Project
Funding: $0
Funding Source: Full NCHRP
Start date: May 2019
End date: June 2021
Objectives

The objectives of this research project are to
• Develop enhanced techniques to consider and evaluate asset management-related risks as part of investment decision-making practices, including qualitative, quantitative, and analytical methods—building on and aligning with previous and continuing research efforts in the areas of TAM and risk management;
• Review effective processes to determine how existing and potential approaches can be used when integrating enterprise, network, and program level risk analysis. Alternative approaches should address how state departments of transportation (DOTs) make multi-objective, cross-asset investment decisions under uncertainty to best support national, state, and local asset performance goals for pavements, bridges, and other assets;
• Develop strategies and procedures for risk mitigation and response with applicable tools and tracking mechanisms for transportation agencies to improve risk assessment in existing and evolving asset management business processes; and
• Develop implementation guidance, including practical tools and techniques for incorporating risk and uncertainty, as well as possible measures of asset resilience that can be integrated into risk assessment procedures in support of national, state, and local asset performance goals.


Active Project
Funding: $500,000
Funding Source: Full NCHRP
Start date: April 2020
End date: July 2021
Objectives

The objective of this research is to evaluate the business case for BIM in the United States by quantifying how adopting enterprise-wide BIM systems can provide increased agency efficiencies and foster advanced, comprehensive lifecycle management of enterprise assets.

The data for this research shall be gathered using domestic and international examples, with the findings targeted for the U.S. market and DOT stakeholders.


Active Project
Funding: $500,000
Funding Source: Full NCHRP
Start date: April 2020
End date: July 2021
Objectives

The objective of this research is to evaluate the business case for BIM in the United States by quantifying how adopting enterprise-wide BIM systems can provide increased agency efficiencies and foster advanced, comprehensive lifecycle management of enterprise assets.

The data for this research shall be gathered using domestic and international examples, with the findings targeted for the U.S. market and DOT stakeholders.


Active Project
Funding: $45,000
Funding Source: Full NCHRP
Start date: October 2020
End date: July 2021
Objectives

The objective of this synthesis is to document current state DOT practice and experience regarding collecting and ensuring the accuracy of element level data. The synthesis will also examine how DOTs are using the data from inspection reports.

Information to be gathered includes (but is not limited to):
• Practices for collecting element level data (e.g., collection software, nondestructive evaluation methods);
• Practices and methods for ensuring the accuracy of the data collected;
• DOT business processes that use element level data (e.g., project scoping, maintenance, bridge asset management modeling and analyses, performance measurement and reporting); and
• Aspects of DOT bridge management systems that use element level data (e.g., deterioration models, action types, action costs, decision rules, performance indices).


Active Project
Funding: $45,000
Funding Source: Full NCHRP
Start date: October 2020
End date: July 2021
Objectives

The objective of this synthesis is to document current state DOT practice and experience regarding collecting and ensuring the accuracy of element level data. The synthesis will also examine how DOTs are using the data from inspection reports.

Information to be gathered includes (but is not limited to):
• Practices for collecting element level data (e.g., collection software, nondestructive evaluation methods);
• Practices and methods for ensuring the accuracy of the data collected;
• DOT business processes that use element level data (e.g., project scoping, maintenance, bridge asset management modeling and analyses, performance measurement and reporting); and
• Aspects of DOT bridge management systems that use element level data (e.g., deterioration models, action types, action costs, decision rules, performance indices).


Active Project
Funding: $45,000
Funding Source: Full NCHRP
Start date: November 2020
End date: August 2021
Objectives

The objective of this synthesis is to document the various technologies used by DOTs to inspect highway infrastructure during construction and maintenance of assets.

Information to be gathered includes (but is not limited to):
• The technologies used for inspection of new and existing highway infrastructure assets (e.g., geospatial technologies, mobile software applications, nondestructive evaluation, remote sensing and monitoring);
• The different methods used to assess the viability, efficiencies, and return on investment (ROI) of inspection technologies;
• How information from these assessments is being used (e.g., for construction project management, to allocate resources, to determine condition of the asset).


Active Project
Funding: $45,000
Funding Source: Full NCHRP
Start date: November 2020
End date: August 2021
Objectives

The objective of this synthesis is to document the various technologies used by DOTs to inspect highway infrastructure during construction and maintenance of assets.

Information to be gathered includes (but is not limited to):
• The technologies used for inspection of new and existing highway infrastructure assets (e.g., geospatial technologies, mobile software applications, nondestructive evaluation, remote sensing and monitoring);
• The different methods used to assess the viability, efficiencies, and return on investment (ROI) of inspection technologies;
• How information from these assessments is being used (e.g., for construction project management, to allocate resources, to determine condition of the asset).


Active Project
Funding: $600,000
Funding Source: Full NCHRP
Start date: July 2020
End date: November 2021
Objectives

The objective of this research is to develop a guidebook that state transportation agencies and others can use for calculation and communication of the value of transportation assets, and for selecting valuation methods to be used in transportation asset management. This guidebook, applicable to transit as well as highway modes, should (1) present a standardized terminology for discussing asset value, (2) describe currently accepted valuation methods, (3) describe the merits and shortcomings of these methods to produce measures of asset value useful for communicating among stakeholders and making resource allocation decisions, and (4) present advice on determining which valuation methods will be most useful in communication and decision-making for a particular agency.

The guidebook shall include at least the following components:
• Terminology and definitions of asset value (a) determined by generally accepted accounting principles, considering initial acquisition or construction costs and depreciation, (b) based on engineering estimates to replace the asset (considering age, condition, obsolescence, and the like), (c) based on estimates of revenues that could be produced from the assets if they were operated as a business venture, (d) based on socio-economic returns to a region’s economy and wellbeing, or (e) other relevant definitions;
• Current best practices for computation and presentation of each of the definitions of value listed above, presented in a manner that can be used by transportation agencies;
• Analysis of the advantages and shortcomings of the value methods as factors to be considered in system-level resource allocation decisions, for example, investment planning, maintenance budgeting, lifecycle management, and presentations for public discussion;
• Identification and description of needs for data and information for value computations;
• A capability-maturity model that an agency can use to characterize its valuation practices and needs and strategies for improvement;
• Advice on incorporating valuation estimates into the agency’s asset management practices.
NCHRP anticipates that the guidebook may be published by AASHTO. It should be compatible with print and web-based versions of AASHTO’s Transportation Asset Management Guide.


Active Project
Funding: $600,000
Funding Source: Full NCHRP
Start date: July 2020
End date: November 2021
Objectives

The objective of this research is to develop a guidebook that state transportation agencies and others can use for calculation and communication of the value of transportation assets, and for selecting valuation methods to be used in transportation asset management. This guidebook, applicable to transit as well as highway modes, should (1) present a standardized terminology for discussing asset value, (2) describe currently accepted valuation methods, (3) describe the merits and shortcomings of these methods to produce measures of asset value useful for communicating among stakeholders and making resource allocation decisions, and (4) present advice on determining which valuation methods will be most useful in communication and decision-making for a particular agency.

The guidebook shall include at least the following components:
• Terminology and definitions of asset value (a) determined by generally accepted accounting principles, considering initial acquisition or construction costs and depreciation, (b) based on engineering estimates to replace the asset (considering age, condition, obsolescence, and the like), (c) based on estimates of revenues that could be produced from the assets if they were operated as a business venture, (d) based on socio-economic returns to a region’s economy and wellbeing, or (e) other relevant definitions;
• Current best practices for computation and presentation of each of the definitions of value listed above, presented in a manner that can be used by transportation agencies;
• Analysis of the advantages and shortcomings of the value methods as factors to be considered in system-level resource allocation decisions, for example, investment planning, maintenance budgeting, lifecycle management, and presentations for public discussion;
• Identification and description of needs for data and information for value computations;
• A capability-maturity model that an agency can use to characterize its valuation practices and needs and strategies for improvement;
• Advice on incorporating valuation estimates into the agency’s asset management practices.
NCHRP anticipates that the guidebook may be published by AASHTO. It should be compatible with print and web-based versions of AASHTO’s Transportation Asset Management Guide.


Active Project
Funding: $500,000
Funding Source: Full NCHRP
Start date: April 2019
End date: November 2021
Objectives

The objective of this research is to develop guidance coupled with one or more prototypical, analytical model(s) to support life-cycle planning and decision-making that applies life-cycle cost analysis as a component of a system-wide transportation asset management program. This guidance and associated analytical model(s) will apply quantitative asset-level, project-level, and network-level inputs to demonstrate methods for calculating life-cycle costs associated with alternative scenarios while taking into account preservation, rehabilitation, replacement, maintenance, and potential risk mitigation actions on a range of highway assets. To the degree possible, costs should reflect condition, risk and uncertainty, mobility, safety, and any other quantifiable aspect of transportation system performance. Although this research is targeted to state DOT highway assets within the overall transportation network, the research should also identify additional research necessary to expand the process to include other modes.


Active Project
Funding: $250,000
Funding Source: Full NCHRP
Start date: July 2020
End date: January 2022
Objectives

The objective of this research is to provide a scoping study for a transportation framework for all-hazards risk and resilience analysis of transportation assets. The scoping study must accomplish the following objectives:

1. Develop a comprehensive and consistent set of risk- and resilience-related terminology for transportation agency use; and
2. Provide a research roadmap for developing a framework for a quantitative all-hazards risk and resilience analysis of transportation assets, with its associated tools, and guidance on its application.

Accomplishment of the project objective(s) will require at least the following four tasks.


Active Project
Funding: $350,000
Funding Source: Full NCHRP
Start date: September 2020
End date: February 2022
Objectives

The objective of this research is to develop a guide for state DOTs and other transportation agencies on incorporating maintenance costs in a risk-based TAMP, including but not limited to the following:

1. A detailed presentation of procedures for identifying, collecting, and managing required data;

2. Using life-cycle planning tools and techniques to demonstrate financial requirements and cost-effectiveness of maintenance activities and preservation programs and the potential change in costs and liabilities associated with deferring these actions;

3. Formulating strategies that identify how to invest available funds over the next 10 years (as required by the TAMP) using life-cycle and benefit-cost analyses (and other applicable tools and techniques) to measure tradeoffs between capital and maintenance activities in alternative investment scenarios; and

4. Designing components of a financial plan showing anticipated revenues and planned investments in capital and maintenance costs for the next 10 years.


Active Project
Funding: $350,000
Funding Source: Full NCHRP
Start date: September 2020
End date: February 2022
Objectives

The objective of this research is to develop a guide for state DOTs and other transportation agencies on incorporating maintenance costs in a risk-based TAMP, including but not limited to the following:

1. A detailed presentation of procedures for identifying, collecting, and managing required data;

2. Using life-cycle planning tools and techniques to demonstrate financial requirements and cost-effectiveness of maintenance activities and preservation programs and the potential change in costs and liabilities associated with deferring these actions;

3. Formulating strategies that identify how to invest available funds over the next 10 years (as required by the TAMP) using life-cycle and benefit-cost analyses (and other applicable tools and techniques) to measure tradeoffs between capital and maintenance activities in alternative investment scenarios; and

4. Designing components of a financial plan showing anticipated revenues and planned investments in capital and maintenance costs for the next 10 years.


Active Project
Funding: $250,000
Funding Source: Full NCHRP
Start date: October 2020
End date: April 2022
Objectives

The objective of this research is to provide a scoping study for a transportation framework for all-hazards risk and resilience analysis of transportation assets. The scoping study must accomplish the following objectives:

1. Develop a comprehensive and consistent set of risk- and resilience-related terminology for transportation agency use; and
2. Provide a research roadmap for developing a framework for a quantitative all-hazards risk and resilience analysis of transportation assets, with its associated tools, and guidance on its application.

Accomplishment of the project objective(s) will require at least the following four tasks.


Active Project
Funding: $350,000
Funding Source: Full NCHRP
Start date: November 2020
End date: May 2022
Objectives

The objective of this research is to develop resources for state DOTs and other transportation organizations to help them explain the value of investing in resilience throughout the life cycle of planning, engineering, design, operations, construction, and maintenance activities.

The resources should provide tools for state DOTs to (1) build the business case for investing in resilience strategies and (2) develop communication strategies to make the public and stakeholders aware of the importance of resilience as part of the state DOT's overall mission. This project should consider the diversity of resiliency issues among state DOTs and agencies.

Accomplishment of the project objective will require at least the following tasks.


Active Project
Funding: $324,998
Funding Source: Full NCHRP
Start date: May 2020
End date: May 2022
Objectives

The objective of this research is to develop a guide for the formulation of long-range plans and budgets for replacement of highway operations equipment. The guide shall include processes and tools for consideration in making investment decisions. For the purpose of this research, long-range is defined as 20-25 years.


Active Project
Funding: $530,000
Funding Source: Full NCHRP
Start date: February 2019
End date: June 2022
Objectives

The objectives of this research are to (1) assess the state of transportation agency practices regarding use of targets in their transportation performance management (TPM) decision making, monitoring performance results, and as necessary adjusting management strategies and desired target levels; and (2) develop resources that agency practitioners can use to implement and maintain a process of monitoring performance and making management decisions based on comparisons of targets and observed system performance. Such resources could include, for example, guidebooks, web-based publications, prototypical planning scenarios, interactive computational tools, and visualization tools.


Active Project
Funding: $300,000
Funding Source: Full NCHRP
Start date: June 2019
End date: July 2022
Objectives

The objectives of this research are to (1) estimate the current and future effect of dynamic CAV technologies on roadway and TSMO asset maintenance programs; (2) develop guidance on existing and proposed measureable standards associated with roadway and TSMO asset maintenance for preventive, reactive, and emerging maintenance needs; and (3) identify the associated resource and workforce development needs.


Active Project
Funding: $500,000
Funding Source: Full NCHRP
Start date: June 2020
End date: September 2022
Objectives

The objective of this research is to develop and disseminate a practitioner-ready guidebook for state DOTs that is focused on methods for the target-setting component of transportation performance management. The guidebook will provide information on selecting effective methods that use both qualitative and quantitative sources to establish performance targets. The guidebook will also address how to re-evaluate targets, taking into account unforeseen changes impacting the transportation system, performance data, and performance reporting requirements.


Active Project
Funding: $350,000
Funding Source: Full NCHRP
Start date: December 2020
End date: December 2022
Objectives

The objective of this research is to develop resources for state DOTs and other transportation organizations to help them explain the value of investing in resilience throughout the life cycle of planning, engineering, design, operations, construction, and maintenance activities.

The resources should provide tools for state DOTs to (1) build the business case for investing in resilience strategies and (2) develop communication strategies to make the public and stakeholders aware of the importance of resilience as part of the state DOT's overall mission. This project should consider the diversity of resiliency issues among state DOTs and agencies.

Accomplishment of the project objective will require at least the following tasks.


Active Project
Funding: $370,000
Funding Source: Full NCHRP
Start date: August 2020
End date: February 2023
Objectives

The objectives of this research are to (1) develop guidelines for the applications of RFID and wireless technologies for highway construction and infrastructure asset management and (2) plan and conduct a workshop to introduce the proposed guidelines to an audience of DOT staff and other stakeholders. At the minimum, the research shall include readiness assessment of RFID and wireless technologies for different applications and implementation requirements.


Active Project
Funding: $370,000
Funding Source: Full NCHRP
Start date: August 2020
End date: February 2023
Objectives

The objectives of this research are to (1) develop guidelines for the applications of RFID and wireless technologies for highway construction and infrastructure asset management and (2) plan and conduct a workshop to introduce the proposed guidelines to an audience of DOT staff and other stakeholders. At the minimum, the research shall include readiness assessment of RFID and wireless technologies for different applications and implementation requirements.