MULTIPLAN 2045

MULTIPLAN 2045

The 2045 Mississippi Unified Long-Range Transportation Infrastructure Plan is currently in progress, and the previous MULTIPLAN 2040 is no longer accessible over the internet. The final draft of the plan is undergoing revision and an environmental impact study is being conducted, so the public review period is expected to begin soon.


Resource Types: Plan
Publication Year:
2020

External Link

Related Sites
TPM Portal