North Carolina DOT TAMP 2022

North Carolina DOT TAMP 2022

North Carolina has published their 2022 TAMP update. The North Carolina Department of Transportation (NCDOT, The Department) has long embraced data driven asset management practices. These practices were first compiled into a single asset management document in 2014. The TAMP is a strategic framework for considering the full life cycle cost and performance of transportation infrastructure. Long-term cost is minimized, and overall life and system-wide performance is maximized. The TAMP documents considerations for preserving the entire network of bridge and pavement assets.


Infrastructure Assets: Bridge, Highway Assets, Pavement
Resource Types: Plan
Management Processes: Performance Based Planning & Programming, Risk Management, Target Setting
Publisher:
North Carolina Department of Transportation

Publication Year:
2022

External Link

Related Sites
TAM Portal